our lil slab at the start and finish. it holds a cast iron 4ft tall fire pit. im gonna build a brick /out door oven set up and this will be the pad it connects to, but that wont be for a bit.
slab size is 4ftx4ft, 2x4 form with footers that went down 4-6 more inches, re-enforced woth 3/8 re bar, plastic mesh and metal h bars (bandit sign racks). we had 800 lbs of crete to use, i had 160 left over which went to shore up our culvert.
Comment